Infrastructure for the next generation of high-density, liquid-cooled computing. From a single node to a 600 MW campus.
600 MW
Phased build-out with hot-aisle containment and on-site substation.
PUE 1.12
Direct-to-chip liquid cooling on every rack, closed loop, zero water draw.
200 kW
Per rack, designed for the next generation of accelerators.